top of page

Because of time limitations for the final presentation, only two of the redesigned spaces for the lighting are included, the change of the building utilization voltage for the electrical depth is discussed, and the contruction management breadth topic.  A PowerPoint can be downloaded, or a PDF version can be viewed using the links on the left. 

bottom of page